Ashkan Bidarian , Mostafa Ghazi Moradi , Mohammad Hassan Ramesht (2021) “PREDICTING THE REALIZATION OF PROJECT GOALS (TIME-COST) ON CONSTRUCTION PROJECTS BASED ON THE ACQUIRED VALUE TECHNIQUE”, PalArch’s Journal of Archaeology of Egypt / Egyptology, 18(08), pp. 2048–2061. Available at: https://archives.palarch.nl/index.php/jae/article/view/9072 (Accessed: 31 October 2025).